00:00.000 --> 00:10.000
Missing stonework: four and two
January’s engineering inspection records four areas of missing stonework upstream and two downstream.

00:10.000 --> 00:20.000
A five-metre collapsed length
It records a five-metre collapsed length at the left-hand side on both upstream and downstream walls.

00:20.000 --> 00:30.000
The capping entry
The inspector recorded that downstream capping had been partly removed. That entry does not identify who removed it.

00:30.000 --> 00:40.000
The work listed
The final comments list work required to the abutment, training walls and parapet walls.

00:40.000 --> 00:50.000
Observation date, not origin date
These are observations recorded on 21 January 2025. They do not establish when the damage first occurred.

00:50.000 --> 01:00.000
Follow each recorded item
Which follow-up records address these particular observations and the listed work?

01:00.000 --> 01:10.000
Bronagh English — The Record
Factual record. No finding of causation or responsibility is made here.