APRIL 2025 ROAD CONDITION RECORD

Killardry: the road before 24 April 2025

A dated record of the Killardry road and bank: 3 April aerial imagery, the rainfall before 24 April, and clearly separated later family photographs.

Factual record. No finding of causation or responsibility is made here.

Last updated 2026-10-11.

Timeline

Context and time are not proof of a work date.

  1. BEFORE 24 APRIL 2025
  2. July 2024 — earlier roadside reference; day not established

    The family’s retained Google Street View screenshot displays a July 2024 date and vegetation along the roadside. The month label is not an exact capture day. The absence of a visible pipe in that limited view does not establish that no pipe existed. The screenshot is not reproduced here; the link opens the location in Google Street View, where historical imagery can be selected if available.

    Source note: Source S1: retained family screenshot. Month-level date only; the link is a location reference, not a guarantee of the July 2024 panorama. Reference.

  3. 30 March 2025 — Sentinel-2 landscape context

    The supplied Sentinel-2 view provides broad landscape context. Its stated 10 m resolution cannot resolve this narrow bank, the pipe or individual protective measures. It is not evidence of the date on which roadside works began.

    Source note: Source S2: family-held Sentinel-2 context image and supplied date. Context only; no works finding is drawn from its pixels.

  4. 3 April 2025 — aerial image, 21 days before the collision

    The Vexcel aerial image records the north-side road and bank before the collision. Lighter exposed-looking ground is visible beside the road. On 21 September 2026, SkyFi explained that the catalogue’s 30 March date was the flight-start date and that the delivered metadata gives the image capture date. That metadata records 3 April 2025. This resolves the earlier catalogue-versus-file date question on the supplier’s explanation. It dates the visible condition, not the start or completion of works, the material’s compaction or the identity of whoever carried them out.

    Source note: Source S3: held Vexcel raster and delivered metadata, 2025-04-03T08:44:24Z; SkyFi clarification received 21 September 2026. Aerial photography, not a satellite image.

    Aerial detail of the road north of Killardry Bridge, with lighter ground beside the road and vegetation on either side.
    3 April 2025. Display extract of the north-side road and bank. The pack’s superseded date banner is omitted; original evidence is retained. No AI enhancement or object identification is used. Credit: © Vexcel Imaging / SkyFi, 2025. Display extract, not the original geospatial product.
    Wider aerial context showing Killardry Bridge below the road junction and the north-side bank detail.
    The same 3 April record in wider context: bridge, junction and north-side road. Reduced for web display from a verified RGB window of the held raster, without sharpening or AI enhancement. This is not a surveyed measurement. Credit: © Vexcel Imaging / SkyFi, 2025. Display extract only.
  5. 6 April 2025 — held Apollo / Beijing-3A image

    The family also holds a georeferenced Beijing-3A orthophoto supplied through Apollo Mapping and dated 6 April, 18 days before the collision. The bridge, junction and approach can be located in it. Roadside colour differences and vehicle-like features are leads for examination, not verified machinery, a work crew or a dated works operation. The image is retained privately while the applicable public-display licence is checked.

    Source note: Source S4: verified delivered orthophoto; date joined to supplier filename and order records, not an embedded camera DateTime tag. Annotated arrows and vehicle labels are interpretations, not additional observations.

  6. 7 April 2025 — catalogue preview only

    A SuperView catalogue preview was supplied for a scene dated 7 April. It is a broad browse image, not a delivered full-resolution scene. A product’s advertised resolution must not be treated as the resolution of this preview. No narrow-roadworks conclusion is drawn from it, and it is not reproduced here.

    Source note: Source S5: held supplier catalogue preview and quote. Purchase and delivery of the full scene are not established.

  7. DATE OF COLLISION
  8. 24 April 2025 — Bronagh’s collision

    Bronagh English died on 24 April 2025. Images captured after that date must not be presented as photographs of the road at the time of the collision.

    Source note: Source S6: the family’s dated public record. Reference.

  9. AFTER 24 APRIL 2025
  10. 1 May 2025 — later junction and road-edge view

    This family photograph shows the junction, roadside vegetation and exposed ground beside the road. The visible junction is the location reference. Left and right here describe the photograph; the view is not used to assert which feature lay on Bronagh’s left as she travelled toward the bridge. The vehicle-registration privacy mask is retained.

    Source note: Source S7: family-supplied 1 May record, visually matched to the retained site photographs. Later condition only.

    Later photograph of the junction near Killardry Bridge, showing the road edges and a vehicle with its registration obscured.
    1 May 2025 — AFTER the collision. Junction and road-edge context. The supplied privacy redaction is retained; no reconstruction is shown. Credit: Family-supplied photograph; original preserved.
  11. 1 May 2025 — later photograph of the pipe and bank

    The later family record shows a blue pipe opening beside exposed bank material. The pipe is on the right in this camera view. This photograph does not measure its invert level, gradient, connection or discharge route, and it was recorded seven days after the collision.

    Source note: Source S7: family walkthrough, dated 1 May 2025 in the held original record and the supplied screenshot. The displayed crop removes phone controls, not road evidence.

    Later family view of a blue pipe opening at the base of an exposed roadside bank, on the right in the photograph.
    1 May 2025 — AFTER the collision. Pipe and bank context; phone interface cropped away. Image-right is not a finding about Bronagh’s direction of travel. Credit: Family-supplied image; original preserved.
  12. 2 May 2025 — held later satellite comparison

    The family holds a second Apollo-supplied orthophoto, dated 2 May, eight days after the collision. The supplier’s product record identifies this scene as Jilin-1, not Beijing-3A. It is later site context, not proof of the road’s condition on 24 April. Public display is held pending confirmation of the applicable licence.

    Source note: Source S8: verified delivered Jilin-1 orthophoto and supplier order chronology. The complete preferred image file is held even though the wider archive download is incomplete.

Rainfall

79.8 mm Seven-day pre-collision total: 10:00 on 17 April to 10:00 on 24 April 2025, Irish local time, at Met Éireann’s Cahir (Toureen) station. These are seven 09:00–09:00 UTC gauge days, not midnight-to-midnight calendar days..

21.5 mm next gauge day: 10:00 on 24 April to 10:00 on 25 April 2025, Irish local time. This interval includes rainfall AFTER the collision. The combined 101.3 mm must not be described as entirely pre-collision rainfall. Gauge readings do not measure road flooding, bank saturation, drain performance or grip at the scene.. This includes post-collision rain and must not be treated as rainfall entirely before 24 April 2025.

These are station observations, not measurements of the road, drain, bank, clay, grip or collision conditions.

Chart of daily April 2025 rainfall at Cahir (Toureen), with 31.1 mm on the 17 April gauge label and 24.2 mm on 18 April; the 24 April bar includes rainfall after the collision.
Whole-month context, not a pre-collision total: April 2025 recorded 109.4 mm. Each label is a 09:00–09:00 UTC gauge day. In particular, the 21.5 mm bar labelled 24 April runs to 10:00 on 25 April in Irish local time and includes post-collision rain. Read the exact seven-day table and windows alongside the chart. Credit: Family-supplied chart using Met Éireann Cahir (Toureen) station 9312 daily observations.

Scroll horizontally to read this table.

Rainfall observations by gauge day
DateRecorded rainfall
31.1 mm
24.2 mm
0.9 mm
9.2 mm
1.1 mm
10.1 mm
3.2 mm

Sources: Rainfall observations · Daily date convention

Open questions

When were the works carried out?

The 3 April image dates a visible pre-collision condition. It does not, alone or by comparison with a summer vegetation view, prove when a particular operation began or finished. Late March and early April remain a period to investigate through dated records.

Needed: Location-specific job cards, gang diaries, works orders, delivery records and contemporaneous site photographs.

What protection and checks were in place?

A limited view cannot establish that no protective measures existed at any time, or whether those measures were adequate. Neither their absence nor their adequacy is established here.

Needed: The traffic-management plan, barriers and signs record, inspection logs and end-of-day checks for the relevant works and dates.

What was the bank material, and was it compacted?

The family describes the exposed material as clay. Photographs do not establish its laboratory classification, moisture content, compaction or condition on the collision night. The rainfall figures are relevant context for examination, not proof of soil movement or a causal mechanism.

Needed: Material specifications, contemporaneous compaction and density records, and qualified geotechnical assessment of what can still be established.

Did the pipe and channel have a working fall?

The blue pipe and roadside feature warrant a location-controlled drainage examination. Their visible appearance does not demonstrate that the pipe had no gravity fall, that an outfall was connected, or that water reached the road. A photograph’s left side must not be substituted for Bronagh’s travel direction.

Needed: A site plan with travel direction, surveyed pipe-invert and outfall levels, drainage drawings and inspection or flow-test records.

Sources

Earlier Street View reference

Family-held screenshot supplied on 22 September 2026, with a visible July 2024 month label. Kept privately; use the Google-hosted view rather than a republished screenshot. The linked guidelines explain display permission, not the image’s date.

Open source

Sentinel-2 context

Family-supplied context image dated 30 March 2025. A low-resolution landscape reference, not a roadworks measurement.

Vexcel capture date and display extract

The original georeferenced Vexcel raster is held privately. Delivered metadata records 3 April 2025 at 08:44:24 UTC. SkyFi’s reply received 21 September 2026 explains the 30 March catalogue date as flight commencement and the delivered metadata as the capture date. Public display uses a static extract with provider credit, not the full raster or private correspondence. The linked FAQ addresses display permission; the capture-date evidence is the family-held metadata and supplier reply.

Open source

6 April Apollo / Beijing-3A record

Complete preferred orthophoto held and integrity checked. Product date is supported by supplier filenames and order chronology. Public-display licence confirmation remains outstanding; the raster, annotations and confidential commercial records are not published.

7 April SuperView catalogue record

Supplier preview and quote held privately. No assertion of full-scene purchase, delivery or native preview resolution.

Bronagh’s dated public record

The family’s public record gives 24 April 2025 as the date of Bronagh’s death.

Open source

Later family photographs and walkthrough

Family records dated 1 May 2025. The supplied images are visually matched to the held site record; the screenshot’s date display is not treated as independent embedded camera metadata. Phone controls are removed only in a labelled display crop and existing registration redaction is retained. Original evidence remains unchanged.

Open source

2 May Apollo / Jilin-1 record

Complete preferred orthophoto held and integrity checked. The supplier product record identifies Jilin-1. This is post-collision context and is not publicly reproduced pending licence confirmation.

Met Éireann Cahir (Toureen), station 9312

Daily gauge observations dated 17–23 April sum to 79.8 mm. The following 24 April observation is 21.5 mm and extends past the collision. Met Éireann assigns a 09:00 UTC observation to the preceding date.

Open source

Questions about the published record

Factual record. No finding of causation or responsibility is made here.

Cahir–Cashel road statistics Cahir–Cashel Deadly place to drive ↗ × Cahir–Cashel road statistics Road statistics · sourced comparison Cahir–Cashel: 3.03× the national road-death rate 1 January 2018–31 December 2023 (six complete calendar years) . In the full Tipperary–Cahir–Cashel Municipal District, including its rural areas, the derived annualized rate was 8.61 people killed per 100,000 residents , compared with 2.84 nationally . This is an area comparison relative to population, not a personal likelihood. This page uses the full municipal district, not the populations of Cahir and Cashel towns. The linked road-deaths map and record has broader coverage and a different purpose. The headline figures 23 people killed in 21 fatal-collision records in the district 8.61 annualized people killed per 100,000 residents 3.03× the State rate on this population basis 36.5% of County Tipperary’s deaths and 26.5% of its population; the district rate was 37.6% above the county rate. District results The district’s fixed Census 2022 population is 44,532 . The 23 people comprised 11 drivers, 5 passengers, 5 pedestrians, 2 motorcyclists . They were not all drivers. Annual district deaths were 6, 4, 1, 3, 3, 6 from 2018 to 2023. Scroll horizontally to read this table. Five Tipperary municipal districts District 2022 population Fatal-collision records People killed People killed per 100,000 per year Clonmel 25,003 10 13 8.67 Tipperary–Cahir–Cashel 44,532 21 23 8.61 Carrick-on-Suir 20,191 7 7 5.78 Nenagh 40,879 11 12 4.89 Thurles 37,290 8 8 3.58 Scroll horizontally to read this table. Annual people killed Year Tipperary–Cahir–Cashel County Tipperary State 2018 6 10 134 2019 4 13 140 2020 1 7 141 2021 3 10 132 2022 3 7 152 2023 6 16 179 County comparison National baseline: the Republic of Ireland recorded 878 people killed across a fixed Census 2022 population of 5,149,139 , an annualized rate of 2.84 per 100,000 residents over these six years. Tipperary recorded 63 people killed , a rate of 6.25 , ranking #2 of 26 counties behind Monaghan (6.38). Tipperary’s rate was 2.20 times the national rate. Scroll horizontally to read this table. All 26 counties, ranked by annualized rate; the CSO county aggregate does not supply mapped source-record counts Rank County 2022 population People killed Fatal-collision records People killed per 100,000 per year 1 Monaghan 65,288 25 — 6.38 2 Tipperary 167,895 63 — 6.25 3 Donegal 167,084 53 — 5.29 4 Roscommon 70,259 22 — 5.22 5 Louth 139,703 41 — 4.89 6 Cavan 81,704 23 — 4.69 7 Mayo 137,970 38 — 4.59 8 Offaly 83,150 22 — 4.41 9 Kerry 156,458 41 — 4.37 10 Kilkenny 104,160 27 — 4.32 11 Leitrim 35,199 9 — 4.26 12 Longford 46,751 11 — 3.92 13 Westmeath 96,221 22 — 3.81 14 Clare 127,938 29 — 3.78 15 Meath 220,826 49 — 3.70 16 Sligo 70,198 15 — 3.56 17 Limerick 209,536 44 — 3.50 18 Wexford 163,919 34 — 3.46 19 Galway 277,737 49 — 2.94 20 Carlow 61,968 9 — 2.42 21 Cork 584,156 83 — 2.37 22 Laois 91,877 12 — 2.18 23 Waterford 127,363 15 — 1.96 24 Wicklow 155,851 18 — 1.92 25 Kildare 247,774 25 — 1.68 26 Dublin 1,458,154 99 — 1.13 A higher district comparator Boyle Municipal District, County Roscommon, recorded 15 people killed in 14 source records from a population of 24,421: 10.24 per 100,000 , about 19% higher than Tipperary–Cahir–Cashel. This is not a claim that Boyle is Ireland’s worst district; 11 districts were screened in this targeted comparison. Clonmel’s 8.67 rate is marginally higher than Cahir–Cashel’s 8.61; the largest raw count is not the highest district rate. Public council minutes: 2024–2026 These later public records are separate from the 2018–2023 statistical comparison. They record requests, responses and planned work—not findings of causation or proof that work was completed. 2025-05-26 James Swords: recorded response to a safety request The minutes record Councillor John O’Heney asking for safety measures following a recent tragic incident. James Swords is listed as District Engineer present; the response is attributed to that role. Limit: The minute does not name the bridge or specify a parapet repair. It does not say that Gardaí were to design or direct a bridge repair. there is an ongoing Gardai investigation into the incident and if there are any recommendations from the report it will be implemented. Excerpt from the minutes, not a verbatim speech transcript. Official minutes — attendance and District Engineer, PDF p. 1 — Officials Present; James Swords, District Engineer Official minutes — District Engineer’s report, PDF p. 5 — Item 3.4, District Engineer’s Report Official minutes — recorded response, PDF p. 6 — Item 3.4, District Engineer’s Report 2024-10-14 Máirín McGrath seconded the default-speed-limit motion Motion 2861 was proposed by Cllr Niall Dennehy and seconded by Cllr Máirín McGrath, a Cahir LEA member. The full County Council recorded unanimous agreement. The motion sought selective application of the new default limits, rather than universal application across the county. Limit: This was not a motion introducing a blanket 80-to-60 reduction. The December clarification below records the legal-advice referral. Official October minutes — Motion 2861, PDF p. 12 — Item 8.2, Notice of Motion Ref. 2861 Official October minutes — unanimous outcome, PDF p. 15 — Notice of Motion Ref. 2861 outcome Official Council AGM minutes — elected-area roles, PDF p. 2 — Item 2.1, elected members by electoral area 2024-12-09 Council clarification and legal advice The minutes record Chief Executive Sinéad Carr acknowledging support for Motion 2861, while explaining that legal advice was being sought on whether a plenary motion could supersede national legislation. The October minutes were to be amended to reflect that clarification. Limit: This does not establish a road-specific exception or a suspension of national rules. Official December minutes — clarification, PDF p. 2 — Item 3.1, Matters Arising on October minutes 2025-01-13 80-to-60 implementation and weather-delayed signs The minutes record 7 February 2025 as the commencement date for the rural-local-road default reduction from 80 to 60 km/h. They also record severe weather delaying sign-installation work and distinguish a later, wider Phase 2 review. Limit: This is a dated implementation note, not proof of the limit or weather at any individual crash site. Official January minutes — Speed Limit Review, PDF p. 11 — Item 7.1, Roads, Transportation, Health & Safety 2026-05-25 477 district bridges; 14 applications; three funded The District Engineer reported €1 million in county bridge funding, 477 bridges in the district, applications for 14 bridges requiring work and funding for three. Limit: The minute does not establish whether Killardry was among the 14; funding is not proof of completed work. Official May 2026 minutes — bridge funding, PDF p. 6 — Item 3.6, District Engineer’s Report 2026-05-25 Temporary measures considered at Rehill Bridge Following Cllr Máirín McGrath’s request for urgent rehabilitation, the District Engineer reported that Rehill tender documents were nearly complete and temporary measures were being considered to reopen the bridge, with completion hoped for by the end of that week. Limit: This records a plan and expectation, not verified completion. Official May 2026 minutes — Rehill Bridge, PDF p. 6 — Item 3.6, District Engineer’s Report The earlier bridge inspection The family’s published summary of Council inspection record TY-L3151-B-010 reports “Significant Damage” on 21 January 2025 and records downstream capping as “partly removed”. That inspection predates both the 24 April 2025 collision and the 26 May 2025 meeting response. Limit: This is a summary of a Council record held on file, not the original report online. The records checked do not establish whether or when James Swords personally received or read the inspection report. Published family summary of the Council inspection record When was the inspection circulated to the district engineering team, and what action was recorded? Further accountability research Read the full sourced record on the primary statistics page . Representatives Engineering Payments Road budgets Crash coverage Weather Surfaces and works Exposure comparisons Method and limits People killed ÷ fixed 2022 population ÷ 6 years × 100,000. Populations are fixed Census 2022 references. Counts concern collision locations, not resident addresses; the result is not a rate per journey or vehicle-kilometre. Current 2024 reference boundaries are applied retrospectively. The series is provisional and subject to revision. The figures do not establish why crashes happened or measure road-maintenance spending. Return home · Open the broader road-deaths map and record Sources RSA SourceData — Map of Collisions source data — Fatal-collision source records, 2018–2023; mapped locations assigned to current reference districts. CSO ROA15 — Persons Killed and Injured — State and county people-killed totals, 2018–2023; provisional/revisable series. CSO ROA12 — All road users — Independent national cross-check of people-killed totals, 2018–2023. CSO Census 2022 Table 8.1 background notes — State and county 2022 population background. CSO FY108 — official statutory LEA population CSV — 2022 population basis and statutory LEA/district mapping. Tipperary County Council Adopted Budget 2024, Table 7 (PDF) — Five municipal-district populations labelled as based on Census 2022; physical page 20. Tailte Éireann 2024 statutory boundary dataset service — Checked 2024 Tailte Éireann statutory municipal-district boundary dataset service; current reference boundaries applied retrospectively. Irish Statute Book S.I. 631/2018 — Optional Boyle municipal-district/LEA mapping context. Download the five-district CSV · Download the 26-county CSV · Download the public JSON snapshot Factual record. No finding of causation or responsibility is made here.

Contact the family

If you have information about this road, this bridge, or the records on this site, you can write to Bronagh's family here.

Sent only to the family. Not shared, not stored by any third party.

Explore the record