Updates
Findings, most recent first
Each finding is a dated entry. Prior entries stay visible — the record never quietly changes.
26 August 2026
New: the story, step by step
A new section sets out what happened as a single stepped account — from the €450 repair priced in 2014 and never done, through the ignored “Warning” of June 2024 and the unactioned “Significant Damage” finding of January 2025, to the night of 24 April 2025 — with a source note on every step and a played-through story mode. Two labelled visual reconstructions of the bridge approach accompany it; they are illustrations, not evidence.
Source: All steps sourced to documents already on this record; see /the-story/.
22 August 2026
Correction: the drop to the water
Some pages on this record previously described the drop from the road to the River Aherlow as “over six metres.” The measured figure in the Denis Wood Associates forensic survey is approximately 4.3 metres to the water surface at the time of inspection. All pages have been corrected to the documented figure. Water level varies; the survey figure is stated as measured.
Source: Denis Wood Associates technical report, surveyed 22 May 2025 (drop to water measured at approximately 4.3 metres).
4 August 2026
The 2018 and 2025 works, read against the chainages
The council's Road Management schedule places a 2018 Road Reconstruction across the bridge section (chainage 1780–2480) and a 2025 reseal reaching chainage 1802. The Killardry section begins at 1780 — so both campaigns worked across it, each adding material and raising the carriageway, while the parapet was never raised to match. The exact 2025 completion date remains outstanding and is being sought.
Source: TCC Road Management, FOI 10526 items 6 and 8 (held)
4 August 2026
District bridge backlog confirmed in 2026 minutes
Signed Cahir-Cashel Municipal District minutes record the District Engineer confirming 477 bridges in the district against €1m in county bridge funding, with 14 applications submitted and three funded. It is an independent, current corroboration of the funding scarcity in which Killardry received nothing.
Source: Cahir-Cashel MD signed minutes, May 2026 (held)
3 August 2026
Five 2025 funds identified, none reaching the bridge
The May 2025 council management report sets out five 2025 funding streams totalling €4,792,990 — bridge rehabilitation, speed-limit signage, drainage, climate adaptation and safety improvement — each of which covers a defect documented at Killardry. The bridge received nothing from any of them.
Source: TCC Management Report, May 2025, Item 9.1 (held)
Video explainers — silent, captioned, with transcripts
Last updated 2026-09-11. This is a living record — findings are added as dated entries and prior versions remain visible.
From the Blog

Roadworks, the bank and the open-drain question
Article

The bend, the warnings and the bridge wall
Article

The engineering record and the council’s response
Article

2023: Tipperary’s highest county death count
Article

The 80-to-60 motion: what the council requested
Article

Cahir–Cashel: questions, requests and decisions
Article

Councillor payments and expenses: follow the figures
Article

Rain, loose soil and the road edge
Article
Video Explainers

The 80-to-60 motion
Video Explainer

Local requests for lower limits
Video Explainer

Tipperary’s 2023 county count
Video Explainer

Which roads changed to 60?
Video Explainer

What the 1 May photograph shows
Video Explainer

Which documents date the works?
Video Explainer

What the January inspector recorded
Video Explainer

From inspection to completion
Video Explainer