What the January inspector recorded

January’s engineering inspection records four areas of missing stonework upstream and two downstream.

About this record

The engineering inspection dated 21 January 2025 records specific observations rather than simply a general rating. Its parapets comment identifies four areas of missing stonework upstream and two downstream; a five-metre collapsed length at the left-hand side on both upstream and downstream walls; and downstream capping recorded as partly removed. Its final comments list work required to the abutment, training walls and parapet walls. Reporting those entries does not identify who removed capping or establish when the recorded damage first occurred. Our question: which follow-up records address those particular observations and the listed work? Council source and public readback: Council engineering inspection, 21 January 2025, bridge TY-L3151-B-010, Parapets Comment and final Comments fields. Public family summary, The lines that matter: https://bronaghenglish.com/documents/tcc-inspections-2024-2025/ The linked page is a family readback, not publication of the complete original inspection file. The detailed measurements and work list are attributed to the original inspection sheet, not to a measurement of the later photograph. The real family wall photograph is from 2026, after the crash. It is later local context, not the engineer’s January 2025 inspection photograph. It cannot date the damage, identify an actor or show the crash-time condition. No exact month is asserted. Bronagh English — The Record is an independent family record, not an official Tipperary County Council publication or channel. Factual record. No finding of causation or responsibility is made here. Watch page and transcript: https://bronaghenglish.com/videos/january-parapet-observations/

Silent, captioned explainer; not crash footage.

Transcript

Missing stonework: four and two

January’s engineering inspection records four areas of missing stonework upstream and two downstream.

A five-metre collapsed length

It records a five-metre collapsed length at the left-hand side on both upstream and downstream walls.

The capping entry

The inspector recorded that downstream capping had been partly removed. That entry does not identify who removed it.

The work listed

The final comments list work required to the abutment, training walls and parapet walls.

Observation date, not origin date

These are observations recorded on 21 January 2025. They do not establish when the damage first occurred.

Follow each recorded item

Which follow-up records address these particular observations and the listed work?

Bronagh English — The Record

Factual record. No finding of causation or responsibility is made here.

Sources

2026 family wall photograph is later context; exact month not asserted.

Factual record. No finding of causation or responsibility is made here.

Watch the record.

Silent, captioned video explainers with transcripts and source context.

Factual record. No finding of causation or responsibility is made here.

Written records →