The record across the network:
Bronagh English

The approach

The approach: works, bank and drainage

Dated views of the approach, a closer look at the bank, and the council’s written account. Family photographs from 1 May 2025 were taken seven days after the crash.

Read the deeper account of what Bronagh faced →

Related public reading: Weather and the bank · Council worksite safety · Loose soil beside roads

The same crossing, 2011 and 2024

Google Street View imagery of the same crossing, dated October 2011 and July 2024, provides a dated comparison of the visible approach.

The Killardry Bridge approach on the L3101, Google Street View October 2011
October 2011.Google Street View imagery, October 2011.
The same approach to Killardry Bridge, Google Street View July 2024
July 2024 — the same view.Google Street View imagery, July 2024.

Beyond the bridge, the far side tells its own story: there, both parapet walls stand intact and capped, and the road continues without the sharp turn a driver meets on the approach where Bronagh’s car left the road.

The far side of Killardry Bridge on the L3101: both parapet walls intact and capped, no sharp turn, Google Street View July 2024
The far side of the bridge: both parapet walls intact and capped, and no sharp turn. Google Street View imagery, July 2024.

Google Street View imagery of the L3101 crossing at Killardry Bridge, dated October 2011 and July 2024 (Google’s own capture dates). These views do not by themselves establish the dates or scope of council work at this bank.

The bank along the approach — and why it matters

Along the approach to the bridge, the family’s 1 May 2025 photographs show a raised roadside earth verge between the carriageway and the ditch. They were taken after the crash and are GPS-tagged at the site.

The long approach road with a raised roadside earth verge along the left edge
The long approach: a raised roadside earth verge is visible along the road edge. The family raises a concern about water leaving the road in heavy rain. Family photograph, 1 May 2025.
Detail of the exposed soil face of the raised roadside verge
Detail of the exposed soil face of the raised roadside verge. Family photograph, 1 May 2025.
The raised roadside verge along the approach, with traffic cones visible beside it
The raised roadside verge along the approach, with traffic cones visible during the post-crash road closure. Family photograph, 1 May 2025.
Detail of exposed soil and loose material on the roadside verge
Detail of exposed soil and loose material on the roadside verge. Family photograph, 1 May 2025.

The family asks where surface water from the approach was intended to discharge, and whether the road edge was protected in rain. The council’s Internal Review Decision says its drainage activity was cleaning roadside-verge inlets and that no specific drainage works were carried out on the bridge itself. The statement distinguishes the bridge from the approach and does not settle those questions. Dated work orders, drainage design, discharge details, inspections and traffic-management records would assist.

Family photographs, 1 May 2025, GPS-tagged at the bridge approach and taken after the crash. Council account: Internal Review Decision, 18 February 2026 — see /documents/internal-review-decision-2026-02-18/. The photographs do not establish the crash-night surface, the date of any works or drainage function. These questions are being pursued through the proper legal process.

The council’s location-specific account

In its Internal Review Decision, Tipperary County Council says the only drainage works on the L-3151 were roadside-verge inlet cleaning, that there were no specific drainage works on the bridge itself, and that the 2025 L-3151 works were northwest of the bridge location. The decision does not identify specific works at this bridge approach. Dated work orders, drainage drawings and inspections, and site-safety and traffic-management records would still be needed to establish the date and scope of any work at this bank. Read the related public council record.

Tipperary County Council, Decision on Internal Review, 18 February 2026 (FOI 174/25), quoted and linked above.

The works beside the approach to Killardry Bridge, shown in the family's GPS-located photographs.

Last updated 2026-09-07. This is a living record — findings are added as dated entries and prior versions remain visible.